29 June 2018

Australia releases consultation paper on draft integrity measures to reform tax treatment of stapled structures

The Australian Treasurer released a public consultation paper (paper) on June 28, on the integrity measures that follows the exposure draft law to implement the March package of measures to reform the tax treatment of stapled structures and similar arrangements. The paper outlines the conditions for stapled entities to access the proposed infrastructure concession and transitional arrangements including seven-year and 15-year concessional periods.

A Global Tax Alert, attached below, provides additional details.

———————————————
ATTACHMENT

Document ID: 2018-1338